Chapter 34: Futures and Futures Options 667
|
||
SPAN Margin. The SPAN margin system (Standard Portfolio ANalysis of Risk)
|
||
is used by nearly all of the exchanges. SPAN is designed to determine the entire risk
|
||
of a portfolio, including all futures and options. It is a unique system in that it bases
|
||
the option requirements on projected movements in the futures contracts as well as
|
||
on potential changes in implied volatility of the options in one's portfolio. This cre
|
||
ates a more realistic measure of the risk than the somewhat arbitrary requirements
|
||
that were previously used (called the "customer margin" system) or than those used
|
||
for stock and index options.
|
||
Not all futures clearing firms automatically put their customers on SPAN mar
|
||
gin. Some use the older customer margin system for most of their option accounts.
|
||
As a strategist, it would be beneficial to be under SPAN margin. Thus, one should
|
||
deal with a broker who will grant SPAN margin.
|
||
The main advantages of SPAN margin to the strategist are twofold. First,
|
||
naked option margin requirements are generally less; second, certain long option
|
||
requirements are reduced as well. This second point may seem somewhat unusual
|
||
- margin on long options? SPAN calculates the amount of a long option's value that
|
||
is at risk for the current day. Obviously, if there is time remaining until expiration, a
|
||
call option will still have some value even if the underlying futures trade down the
|
||
limit. SPAN attempts to calculate this remaining value. If that value is less than the
|
||
market price of the option, the excess can be applied toward any other requirement
|
||
in the portfoliol Obviously, in-the-money options would have a greater excess value
|
||
under this system.
|
||
~
|
||
How SPAN Works. Certain basic requirements are determined by the futures
|
||
exchange, such as the amount of movement by the futures contract that must be mar
|
||
gined (maintenance margin). Once that is known, the exchange's computers gener
|
||
ate an array of potential gains and losses for the next day's trading, based on futures
|
||
movement within a range of prices and based on volatility changes. These results are
|
||
stored in a "risk array." There is a different risk array generated for each futures con
|
||
tract and each option contract. The clearing member (your broker) or you do not
|
||
have to do any calculations other than to see how the quantities of futures and
|
||
options in your portfolio are affected under the gains or losses in the SPAN risk array.
|
||
The exchange does all the mathematical calculations needed to project the potential
|
||
gains or losses. The results of those calculations are presented in the risk array.
|
||
There are 16 items in the risk array: For seven different futures prices, SPAN
|
||
projects a gain or loss for both increased and decreased volatility; that makes 14
|
||
items. SPAN also projects a profit or loss for an "extreme" upward move and an
|
||
"extreme" downward move. The futures exchange determines the exact definition of
|
||
"extreme," and defines "increased" or "decreased" volatility. |